Amsterdam Open Water Swim Meet Report
This is a report on the feasibility of hosting a 5km open water swimming event through the canals of Amsterdam, based on the theoretical concerns raised by the municipality of Amsterdam.
Key facts
- What: The swim has to have a length of 5km.
- Where: Has to be proposed anywhere in the canals of Amsterdam according to infromation gathered.
- When: May 2024
Contents of report